Variance is calculated on the basis of allocated hours (via Project Upload Utility or via Scheduler), scheduled hours (via Scheduler), and actual hours (via Time and Expense Report). Three types of variances have been introduced with v4.3 of the Governance Portal. These are:
Note: Allocated hours are calculated when a user is assigned to a project and certain number of hours are inputted as Allocated Hours. User logs a timesheet and enters hours per day for that project. The system calculates the Actual Hours based on hours logged for standalone days. Similarly, the system calculates the Scheduled Hours based on hours assigned for individual days, after a user has been assigned individual hours on daily basis.
Project core searches will display the variance fields along with Allocated Hours, Scheduled Hours, and Time Report Total Hours fields. Variance can be less than 0 in the following cases:
Note: Allocated hours can be assigned for all project-specific roles but scheduled/assigned hours can be filled only for team members. Therefore, time and expense reports will show "0" for scheduled hours, while calculating variances.
Note: If both Project Name and User Name fields are displayed, then hours assigned to multiple users assigned to a project will be displayed as different line items in project core search. However, if the User Name field is not displayed, the sum of hours assigned to multiple users will be displayed.